London View Management Framework SPG
The London Plan is a statutory strategy required by the Greater London Authority Act 1999. It is prepared by the Mayor of London and provides a spatial development strategy setting out an economic, environmental, transport and social framework for the development of London.
The Mayor also publishes Supplementary Planning Guidance (SPG) for London which provides additional details on policies set out in the London Plan. A range of Best Practice Guidance (BPG’s) are also published.
Supplementary Planning Guidance is provided where the level of guidance required is to detailed for inclusion in the development plan, or if a rapid policy response to is needed to an emerging issue. It provides support for statutory development plans, but carries less weight than them when planning matters are considered and cannot create new policies.
The London View Management Framework (LVMF) is a piece of Supplementary Planning Guidance (SPG) published in support of policies 7.11 and 7.12 of the ‘London Plan’.
The London View Management Framework is intended to help preserve London's character and built heritage by setting out policy for managing the impact of developments on key panoramas, river prospects and townscape views. Guidance is targeted at boroughs, consultees and applicants for planning permission. It was published in March 2012 following a period of consultation.
The London View Management Framework is available to download in three parts:
- LVMF SPG March 2012 pt1.
- LVMF SPG March 2012 pt2.
- LVMF SPG March 2012 pt3.
Developments should seek to make a positive contribution to designated views, giving consideration to their impact on the foreground, middle ground and background of views.
The process of making a planning application for a development that might affect a designated view includes:
- Undertaking a scoping study in consultation with the local authority to assess whether the development impacts on designated views and agreeing assessment points from which that impact might be evaluated.
- Preparing a description of the view.
- Preparing a description of the impact on the view, including a description of the development, its location, setting, height, scale, design, external appearance and its relationship to important buildings and landmarks.
If an application does not conform with the principles and guidance set out in the LVMF, it should be refused.
The designated views are:
London Panoramas:
- Alexandra Palace.
- Parliament Hill.
- Kenwood.
- Primrose Hill.
- Greenwich Park.
- Blackheath Point.
- The Mall to Buckingham Palace.
- Westminster Pier to St Paul’s Cathedral.
- King Henry VIII’s Mound, Richmond to St Paul’s Cathedral.
River Prospects:
- Tower Bridge.
- London Bridge.
- Southwark Bridge.
- Millennium Bridge and Thames Side at Tate Modern.
- Blackfriars Bridge.
- Waterloo Bridge.
- The South Bank.
- Golden Jubilee/Hungerford Footbridges.
- Westminster Bridge.
- Lambeth Bridge.
- Victoria Embankment between Waterloo and Westminster Bridges.
- Jubilee Gardens and Thames Side in front of County Hall.
- Albert Embankment between Westminster and Lambeth Bridges
- Along Thames path near St Thomas’ Hospital
- Bridge over the Serpentine to Westminster.
- Island Gardens, Isle of Dogs to Royal Naval College.
- The Queen’s Walk to Tower of London.
- St James’s Park to Horse Guards Road.
- Parliament Square to Palace of Westminster.
In addition, The Secretary of State for Communities and Local Government has issued directions in relation to 13 Protected Vistas.
Contents |
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Accessible London.
- BREEAM Visual comfort View out.
- Conservation area.
- Designated sites.
- Design and access statement.
- GLA Housing Design SPG.
- Listed building.
- London plan.
- Non-statutory consultees.
- Planning permission.
- Rights of way.
- Right to light.
- Site of Special Scientific Interest.
- Statutory consultees.
- Supplementary Planning Guidance.
- The London Plan.
- Tree preservation order.
[edit] =
[edit] =
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.